Automatic Lubricators for Fan, Blower and Pump Bearings
Fans, blowers and pumps run for long hours in places a fitter does not reach often: roofs, ducts, cooling towers and pump houses. A single-point automatic lubricator on each bearing keeps the grease going in between visits.
How we supply
- Quote on working days, usually the same day, with delivered price and lead time
- GST tax invoice on every order
- Dispatch: stock items within 2 working days; other grades to order, lead time stated on the quote
- Data sheet: the manufacturer’s sheet goes out with the quote
Supplying industrial plants since 2016 · GSTIN 36AAFCV6218F1ZB · Udyam UDYAM-TS-02-0002151 · D-U-N-S 860399487
Machines the maker lists
Water pumps, blowers, air handling units, air conditioners, cooling towers, exhaust fans, ventilators and air compressors are all in the maker's list of machines to fit. The same unit is used on each; the cup size and the period setting change with the bearing.
Supplied to order. The maker's name, model number and data sheet are on the quotation. Every figure on this page is taken from the maker's catalogue; the maker may change specifications without notice, so the data sheet sent with the quotation is the one that applies.
Request a quote
Send the machine, the bearing designation, the speed and the number of points.
Quoting for: Automatic lubricator for fan or pump bearings, to order
Short of time? Get a call back
We call during working hours. Your number is used only for this enquiry.
Buying several items? Send your whole list in one go →
We use these details only to quote and supply. We do not sell or share them. See our Privacy Policy.
How much grease each setting gives
| Period set on the unit | 60 ml cup, per month | 150 ml cup, per month | 250 ml cup, per month |
|---|---|---|---|
| 1 month | 60 ml | 150 ml | 250 ml |
| 2 months | 30 ml | 75 ml | 125 ml |
| 3 months | 20 ml | 50 ml | 83.3 ml |
| 4 months | 15 ml | 37.5 ml | 62.5 ml |
| 6 months | 10 ml | 25 ml | 41.7 ml |
| 12 months | 5 ml | 12.5 ml | 20.8 ml |
Each dispensing cycle delivers a fixed shot: 0.167 ml from a 60 ml cup, 0.417 ml from a 150 ml cup and 0.694 ml from a 250 ml cup. The period setting changes how often the shot is given, from every 2 hours on the 1-month setting to every 24 hours on the 12-month setting.
Roofs, towers and other places that get missed
The dispensing period can be set from 1 to 12 months, so a bearing on a roof fan or a cooling tower is greased between visits. On the RFID versions each point carries a tag that is scanned with an NFC phone on the round, which records that the point was reached and when the cup was changed.
Standby and duty machines
A standard unit dispenses on the calendar. For a standby pump or a fan that runs part of the day, the smart series can take an external DC supply that switches with the machine, so grease is fed only during running hours.
Specifications
| Item | As stated in the maker's catalogue |
|---|---|
| Type | Single-point, motor-driven, battery-powered grease lubricator. One unit feeds one point. |
| Grease cup sizes | 60 ml, 150 ml and 250 ml; 500 ml in the smart series |
| Dispensing period | 1 to 12 months, set on DIP switches on the unit |
| Outlet pressure | 75โ150 psi (5โ10 bar), with output adapted to back pressure |
| Operating temperature | โ20 to +60 ยฐC. This is the limit of the drive; the grease must still pump at that temperature. |
| Grease outlet | 1/2" PT male |
| Power | 6 V lithium battery pack; the smart series can also run from an external DC supply |
| Size, height ร diameter | 60 ml: 13.9 ร 8.9 cm. 150 ml: 16.3 ร 8.9 cm. 250 ml: 19.6 ร 10.2 cm |
| Blockage warning | The unit monitors the feed and flashes a warning light if the line is blocked, the cup is empty or the battery is low |
| Grease | Maker's pre-filled cups, or an empty cup filled with your own grease |
Grease and upkeep
The cup can be filled with your own grease, so the grease already approved for the bearing stays in use. We supply it: see industrial greases and the grease compatibility guide before changing grease type.
The grease cup and the battery are replaced together at the end of each cycle. If the warning light flashes, check for a blocked line, an empty cup or a low battery. Use the maker's cups and battery packs; a lithium pack must not be recharged, opened or heated.
What to send for a quotation
For each point send the machine, the bearing designation, the shaft speed, the running hours per day, the ambient temperature and the grease now in use. The grease quantity and interval are then worked out per bearing, and the cup size and period setting follow from that.
Terms
We quote on working days, usually the same day. Lubricators are supplied to order, so the lead time is stated on the quotation. Transit is 48โ72 hours in South India and 5โ7 days elsewhere after dispatch. Payment is in advance against a proforma invoice, and GeM orders follow GeM terms. Every order carries a GST tax invoice. Prices are on request.
Frequently Asked Questions
Which fans and pumps can be fitted?
The maker lists water pumps, blowers, air handling units, cooling towers, exhaust fans, ventilators and air compressors. Each greased bearing takes one unit.
How often does the cup need changing?
The period is set from 1 to 12 months. The cup and the battery are changed together at the end of each cycle.
What about a standby pump?
The smart series can take an external DC supply that switches with the machine, so it greases only while the pump runs.
Can I keep my present grease?
Yes. The maker offers an empty cup to fill with your own grease. We supply the grease.
How do I get a price?
Prices are on request. Send the points and quantities and we quote on working days, usually the same day.
Send your fan and pump list
Send the machines, the bearing designations and the speeds. We quote on working days, usually the same day, with the lead time.
Request a quote