Power Generation — Lubricants, Transformer Oil & Protection

Generation plant has four consumable problems that are normally four suppliers: turbine and transformer oils, gearbox and bearing lubrication, fire protection for the transformer yard and cable galleries, and surge protection for everything with a control card in it. Wind and solar have the last two worst. We carry all four, and this page states the standard each product actually meets.

📍 Hyderabad-based bulk warehouse
🏭 210L · 1000L IBC · 20kL tanker dispatches
📋 Authorised: Veedol, GS Caltex, Balmer Lawrie, SELCO, Ador, Citel, HD Fire
🤝 GeM & Udyam registered for PSU supply

Why Generation Plants Buy From Us

Standards We Can Show You

Kixx Turbine Oil is to ISO 8068. Balmerol transformer oil is to IS 335:2018, with an IEC 60296:2020 reference grade. Water spray systems are designed to IS 15325, sprinklers to IS 15105, surge protective devices to IEC 61643-11. Every one of those is checked against the issuing body’s own listing, not against what reads plausibly.

Transformer Oil With the Service Behind It

IS 335 oil in 50 L and 200 L service packs for top-up, plus on-site filtration, degassing and dielectric-strength restoration through our partner network. Buying oil is the easy half; restoring a transformer to a tested dielectric strength is the half that matters.

Fire Protection Designed, Not Just Supplied

HD Fire deluge, water spray, sprinklers and foam, sized to the Indian codes for transformer yards, cable galleries, coal handling, turbine lube-oil rooms and fuel storage. Hydrant and pump packages are sourced from their manufacturers and we say so — we do not put another maker’s pump under HD Fire’s name.

DC Surge Protection That Matches the Array Voltage

Solar DC is not AC with a different label. Citel DS50PV Type 2 DC SPDs come in 600 V, 1000 V and 1500 V variants, with Type 1+2 where an external lightning protection system exists, plus gPV backup fuses and isolators coordinated per IEC 61643-32 and IEC 60364-7-712. Specifying an AC device on a DC string is a fire, not a fault.

GeM, PSU and Utility Documentation

GeM and Udyam registered, with test certificates, per-batch certificates of analysis and authorisation letters supplied on despatch — the pack state utilities, NTPC-class plants and IPP contractors ask for at inspection.

Stocked in Secunderabad

Same-day dispatch on stocked lines across Telangana and Andhra Pradesh, pan-India through our group network, in drums, IBCs and tanker quantities where volume justifies it.

What We Supply a Generating Station

Turbine Oils — GS Caltex Kixx

Kixx Turbine Oil ISO VG 46 and ISO VG 68, premium inhibited turbine oils to ISO 8068 with antioxidant, rust, corrosion and anti-foam inhibitor packages. VG 46 for steam turbine bearing, governor and control-oil service and for heavy-frame industrial gas turbines; VG 68 for hydro turbine bearing service on Pelton, Francis and Kaplan sets, and for turbo-blowers and turbo-compressors on the plant side.

Transformer Oils — Balmerol

Highly refined naphthenic mineral insulating oil to IS 335:2018, the PSU-manufactured standard for new distribution and power transformers, plus an inhibited grade to IEC 60296:2020 with DBPC antioxidant for extended oxidation life. Service top-up in 50 L drums and 200 L barrels, reclaimed service-grade oil where economics favour it, and on-site filtration, degassing and dielectric restoration through our partner network.

Gear Oils — Mills, Wind Drives and Auxiliaries

Veedol Industrial Gear EP ISO VG 100 to 680 with sulphur-phosphorus EP additive, Industrial Gear EP HD for high-shock-load duty, and Veedol Synthetic Gear PAO where oil temperature runs continuously above 90°C. Balmerol Protomac SP to IS 8406 for enclosed industrial drives. Coal mill, ID and FD fan, cooling tower, conveyor, ash handling and crane gearboxes.

Greases — Wet, Hot and Heavily Loaded

Balmerol Liprex EP lithium EP grease for general plant bearings and Balmerol CCSM HT calcium sulfonate complex where water, heat and load arrive together — ash handling, coal handling in monsoon, cooling tower fan bearings, boiler feed pump drive ends. Kixx MP 3 NLGI 3 lithium soap for multipurpose points.

Hydraulic and Control Fluids

Balmerol Catmatsu HTX ISO VG 32 to 100 and Protomac H 32/46/68 for plant hydraulics; Veedol Avalon HLP to IS 11656 for anti-wear duty. Balmerol Catmatsu FR where a fire-resistant fluid is called for on safety-critical hydraulics near hot surfaces — governor and control systems adjacent to steam lines being the obvious case.

Fire Protection — HD Fire

Deluge valves and water spray systems designed to IS 15325 for transformer yards and outdoor oil-filled equipment. Sprinklers to IS 15105 and NFPA 13 for cable galleries, turbine lube-oil rooms, coal conveyor houses and stores. Foam pourers and monitors to IS 12835 and NFPA 11 for fuel-oil tank farms. Hydrant and pump packages sourced from their manufacturers — fire pumps to IS 12469.

Surge Protection — Citel AC and DC

AC side: DACN1-25VGS Type 1 lightning-current SPDs at the service entrance, DAC50VGS and DACF15S Type 2+3 at the final line for DCS, SCADA and instrument cabinets, all to IEC 61643-11. DC side for solar: DS50PV-600, DS50PV-1000 and DS50PV-1500 Type 2 DC SPDs matched to string voltage, Type 1+2 combined where an external LPS is present, with gPV backup fuses and isolators per IEC 61643-32 and IEC 60364-7-712.

Welding Consumables for Boiler and Pipework

Ador Celwel cellulosic electrodes — E6010, E7010-G, E7010-P1, E8010-G, E8010-P1 — for cross-country and pipeline root runs, and Tenalloy low-hydrogen low-alloy grades for pressure and structural work. Supabase E7018 for restrained structural joints. Ador Automelt submerged-arc flux for heavy structural fabrication.

Where It Goes on the Plant

Turbine Island

Steam turbine journal and thrust bearings · governor and control-oil systems · lube-oil consoles, coolers and centrifuges · turning gear · generator bearings and seal-oil systems · condensate extraction and boiler feed pumps · turbo-blowers

Boiler, Coal and Ash Handling

Coal mills and pulveriser gearboxes · ID, FD and PA fan bearings · stoker and feeder drives · conveyor drives, idlers and take-ups · crusher and screen bearings · ash handling pumps and slurry lines · soot blower drives · ESP rapper mechanisms

Electrical and Switchyard

Power and distribution transformers · tap changers · switchyard structures and outdoor oil-filled equipment · cable galleries and trenches · DCS, SCADA and relay panels · battery and UPS rooms · station auxiliary supplies

Hydro, Wind and Solar

Hydro turbine guide bearings and governor systems · wicket gate mechanisms · wind turbine gearboxes, yaw and pitch drives · tower base control cabinets · solar string combiners and inverter DC inputs · tracker drives and motors · array earthing and lightning protection

Balance of Plant

Cooling tower fan gearboxes · circulating water pumps · air compressors and instrument air dryers · water treatment and DM plant pumps · EOT and maintenance cranes · fire pumps and hydrant systems · standby DG sets

Generation Across the South

Generation in southern India is a mix of coastal thermal, inland hydro, and a very large and still growing renewable base. The consumable and protection profile changes sharply between them, and so does the specification pressure.

  • Coastal Andhra thermal belt — Vizag, Krishnapatnam, Nellore: coal-fired capacity attached to ports, with salt-laden air, monsoon humidity and heavy coal and ash handling. Wet-duty greases, water spray protection on transformer yards, and corrosion in the switchyard are the recurring problems.
  • Telangana thermal and hydro: a mix of thermal capacity and hydro on the Godavari and Krishna systems. Hydro sets are turbine-oil and guide-bearing work; the thermal plants carry the full coal-handling and cable-gallery fire-protection load.
  • Anantapur, Kurnool and the Rayalaseema solar corridor: among the largest solar concentrations in India, with utility-scale plants running 1000 V and increasingly 1500 V DC. High lightning exposure on open arrays makes DC surge protection and array earthing a design item rather than an accessory.
  • Karnataka wind and solar — Ballari, Chitradurga, Gadag, Tumakuru: wind farms with gearbox and yaw-drive lubrication needs, tower-base control cabinets exposed to transients, and increasingly co-located solar. Access is the constraint — a wind gearbox oil change is planned months ahead, so specification errors are expensive.
  • Tamil Nadu wind belt and Chennai industrial generation: the Muppandal and Coimbatore wind corridors, plus captive and industrial generation attached to the Chennai manufacturing base. Captive plant tends to be smaller, older and harder to shut down, which pushes everything towards condition monitoring.

Beyond Supply

Turbine and Transformer Oil Condition Monitoring

Turbine oil: viscosity, acid number, water content, particle count to ISO 4406, air release and foam. Transformer oil: breakdown voltage, moisture, acidity and dissolved gas analysis. We coordinate the laboratory work and read the trend against your baseline rather than handing you a certificate.

Transformer Oil Filtration and Degassing

On-site filtration, degassing and dielectric-strength restoration through our partner network, for utility distribution transformers and industrial installations. Reclaimed service-grade oil where the economics favour it over new fill.

Fire System Design Review

Water spray for transformer yards to IS 15325, sprinkler design to IS 15105, foam to IS 12835 and NFPA 11. We will review an existing design against the code it claims to meet, which on older installations is often where the gap is — not in the hardware.

SPD Coordination Survey

Type 1, 2 and 3 coordination, cable lengths, earth bonding and backup protection, sized per IEC 61643-11 and IEC 61643-12 on the AC side and IEC 61643-32 and IEC 60364-7-712 on the DC side. Most SPD failures we see are coordination and bonding problems, not device failures.

Speak to a Power-Plant Supply Specialist

Address: H.No.10-2-309, Flat No 201, Sudha Vaishnavi Residency, Street No 4, West Marredpally, Secunderabad, Telangana 500026
Hours: Monday–Saturday, 9:30 am – 7:00 pm IST

Frequently Asked Questions

Which turbine oil do you supply and what standard does it meet?

GS Caltex Kixx Turbine Oil in ISO VG 46 and ISO VG 68, both premium inhibited turbine oils meeting ISO 8068, with antioxidant, rust, corrosion and anti-foam inhibitor packages. VG 46 is the usual choice for steam turbine bearing, governor and control-oil service and for heavy-frame industrial gas turbines; VG 68 for hydro turbine bearings on Pelton, Francis and Kaplan sets and for turbo-blowers and turbo-compressors.

Is your transformer oil to IS 335 or IEC 60296?

Both are available. The standard grade is a highly refined naphthenic mineral insulating oil to IS 335:2018, which is the PSU-manufactured standard for new distribution and power transformers in India. Where an inhibited oil is specified we supply a grade to IEC 60296:2020 with DBPC antioxidant for extended oxidation life. Service top-up comes in 50 L drums and 200 L barrels, and we can arrange on-site filtration and degassing rather than only selling you the oil.

What fire protection does a transformer yard actually need?

For outdoor oil-filled transformers the normal answer is a fixed high or medium velocity water spray system designed to IS 15325, actuated by a deluge valve, with the spray nozzle layout worked out against the transformer envelope and the oil volume. Sprinklers to IS 15105 belong in cable galleries, turbine lube-oil rooms and enclosed areas, not on an outdoor transformer. We supply HD Fire deluge valves, spray nozzles and sprinklers; hydrant and pump packages are sourced from their manufacturers, with fire pumps to IS 12469.

Which DC surge protective device for a 1500 V solar string?

Citel DS50PV-1500, a Type 2 DC SPD rated for 1500 V DC applications — utility-scale plants have moved to 1500 V for balance-of-system efficiency and the device has to match. Where the site has an external lightning protection system you need a Type 1+2 combined DC SPD instead. Either way it needs coordinated gPV backup fusing, DC isolation and earthing per IEC 61643-32 and IEC 60364-7-712. An AC SPD on a DC string does not clear the arc, and that is a fire rather than a nuisance trip.

Do you supply wind turbine gearbox oil?

We supply industrial gear oils — Veedol Industrial Gear EP, Gear EP HD and Synthetic Gear PAO — and they suit yaw drives, pitch drives and many auxiliary gearboxes. For the main gearbox, be careful: turbine OEMs qualify specific oils against their own approved-list, and a main gearbox oil change is a crane operation you plan months ahead. Send us the turbine model and its approved-fluid list and we will quote against it or tell you it is outside our range. We would rather say that than have you drain a gearbox for the wrong oil.

How often should turbine and transformer oil be tested?

Turbine oil quarterly as a baseline, monthly where the unit is base-loaded or the reservoir has had water in it: viscosity, acid number, water content, ISO 4406 particle count, air release and foam. Transformer oil annually for breakdown voltage, moisture and acidity, with dissolved gas analysis at the interval your maintenance policy sets - six-monthly on critical units is common. Trends matter far more than single results, which is why we keep the history for supply customers.

Can you supply welding consumables for boiler and pipework repair?

Yes. Ador Celwel cellulosic electrodes — E6010, E7010-G, E7010-P1, E8010-G and E8010-P1 — for pipeline and cross-country root runs, Tenalloy low-hydrogen low-alloy grades for pressure and structural work, and Supabase E7018 for restrained structural joints. Ador Automelt submerged-arc flux where heavy structural fabrication is involved. Procedure and consumable selection should follow your welding procedure specification, and we will quote against it rather than around it.

Do you supply to IPPs and state utilities outside Telangana and Andhra Pradesh?

Yes, pan-India through our group network, and we are GeM and Udyam registered for public-sector procurement. Test certificates, per-batch certificates of analysis and authorisation letters are supplied on despatch. Stocked lines dispatch same day from Secunderabad; sourced items and engineered fire-protection packages are quoted with a lead time.

Get a Power-Plant Quotation or a System Review

Send us your turbine and transformer oil schedule, your switchyard protection drawing, or your solar string configuration, and we will quote named products against the standards they actually hold. Where something falls outside what we can supply properly, we will tell you and point you at who can.

Request a Quote Call +91-99128 25442

Chat on WhatsApp